UTT10
UTTERLY TY
| Surface Treatment: | |
|---|---|
| Applicable Pipe: | |
| Anti-rust Grade: | |
| Installation Way: | |
| Availability: | |
| Quantity: | |
The UTT10 Structure Attachment is a UL Listed and FM Approved beam clamp fitting designed for bracing pipe against sway and seismic disturbance. It clamps directly onto the flange of a steel beam, angle or channel, providing a rigid anchoring point for diagonal seismic braces in fire sprinkler and MEP piping systems — without field drilling or welding on the structure.
The serrated clamp pad bites into the structural steel flange while a 1/2 in. / M12 fastener secures the attachment. The grooved stud receives the brace-side fitting, completing the diagonal brace assembly with standard Sch 10 / Sch 40, GB/T 3091 or JIS G3454 pipe as the brace member.
UL Maximum Design Load | ||||
Brace Member | lbs. | KN | Wt. Each | |
lb. | kg | |||
1" SCH40 pipe | 1885 | (8.38) | 1.54 | (0.70) |
FM Maximum Design Load | ||||||
Brace Member | Horizontal load ratings installation angle 30°-44° | Horizontal load ratings installation angle 45°-59° | Wt. Each | |||
Ibs. | kN | Ibs. | kN | lb. | kg | |
1" SCH40 pipe | 1490 | (6.62) | 1980 | (8.80) | 1.54 | (0.70) |
No drilling, no welding — the beam clamp grips the steel flange directly, saving installation time and keeping the structure undamaged; fully removable for maintenance or reconfiguration.
One size covers all — fits braced pipe up to 8 in., simplifying procurement and site inventory.
Standard fastener interface — 1/2 in. or M12 bolt hole for attachment to structure.
Wide brace-pipe compatibility — works with Sch 10, Sch 40, GB/T 3091 and JIS G3454 pipe as the brace member.
Zinc-plated steel body — corrosion protection for indoor mechanical and electrical service.
Seismic and sway bracing of fire sprinkler piping (NFPA 13 systems)
Bracing of HVAC water pipes, process piping and electrical conduit runs
Commercial towers, industrial plants, logistics warehouses, metro and airport projects where UL/FM-listed bracing components are specified
Retrofit bracing on existing steel structures where drilling or hot work is not permitted
The connection mode of base part connected with the building.The connection belween the base pat and the building is copleled.The accessonies couIected with the base part is sch40 1-inch pipe.The pipe must be clamped to the bottom of the base part,then fixed with the shear bolt.Tighten the shear bolt until heads break off.Tighten the shear bolt until heads break off.