UTT7301A
UTTERLY TY
| Material: | |
|---|---|
| Surface Finish: | |
| Processing Method: | |
| Suitable For: | |
| Availability: | |
| Quantity: | |
The fitting works as the load transfer point between the building structure and the diagonal brace member. One leg bolts to the structure, concrete or steel deck; the other leg engages the strut channel or brace rod. Under seismic movement, the connecting seat restrains lateral and longitudinal displacement of the pipe run, keeping the sprinkler line and mechanical piping aligned and preventing joint failure at couplings and restraints.
Single piece formed steel body. Pressed from one carbon steel plate with no weld in the load path, so the section is consistent part to part and free of weld related variability.
Zinc coating provides long term corrosion protection for underground parking, plant room and outdoor exposed riser applications.
Fast rigid installation. Pre punched round mounting hole and open slot engage anchor bolt and strut channel without on site drilling, welding or thread cutting, shortening brace installation time per joint.
High stiffness under cyclic load. Rigid type connection limits pipe movement in both lateral and longitudinal directions, supporting NFPA 13 and GB 50981 restraint layout requirements for sprinkler mains and branch lines.
Material | Q235B Carbon Steel |
Surface Finish | Hot-Dip Galvanized / Electro Galvanized |
Processing Method | Stamping & Bending |
Connection Type | Bolt Fastening, Wire Cable Sway Brace |
Suitable For | C Strut Channel |
Application | Fire Pipe, Water Pipe, HVAC, Cable Tray Seismic Bracing System |
Fire sprinkler systems. Lateral and longitudinal sway bracing of sprinkler mains, branch lines and riser bases in wet, dry and pre action installations, per NFPA 13 restraint spacing.
MEP piping seismic bracing. Restraint of domestic water, chilled water, condenser water, drainage and HVAC hydronic pipe runs suspended from the structure.
Building fire protection works. Braced connections in fire pump rooms, riser shafts and floor distribution manifolds of high rise buildings.
Commercial complexes and mixed use towers. Dense multi trade pipe racks where strut channel based rigid bracing saves ceiling height and installation time.
Industrial plants and factories. Process piping, utility piping and cable tray bracing in manufacturing, pharmaceutical, food and electronics facilities.
Underground parking garages. Rigid brace attachment to concrete soffit and steel deck where hot dip galvanized finish is required for the humid below grade environment.
Also applicable to data centres, hospitals, airports, logistics warehouses and any project located in a seismic design zone.
Inner Packing: Each pipe clamp packed in a plastic bag, then placed in an export-standard carton box.
Outer Packing: Secured on fumigation-free plywood pallets with strapping bands, suitable for safe long-distance transportation.
Shipping Methods: Sea freight, air freight, and international express are available.
Shipping Port: Qingdao Port, Shandong, China.
Lead Time: 7–15 days for regular models, subject to order quantity.