UTT13 UTT18
funditus TY
| Availability: | |
|---|---|
| Quantity: | |
UL FM Approbata Pipe Sway Brace Fibulae enim ignis Sprinkler Support
UTT13 UTT18 est seismica dominatio fistulae fibulae affectum (fibulatae uestrae) machinatum ad reprimendum ignem aspersorium limbum et fistulam mechanicam contra ditionem lateralem et perturbationem seismicam. Tibiae adscriptionis componentia completae disciplinae ue rationi inservit: coniuncta cum structuris affectione convenienti et bracteali elemento, plenam seismic comprehendens conventum gravitatis et statio non-structuralis componentis format.
Fibulae usui destinatur ad systemata fistulae spargentis ignis, HVAC et plumbi fistula subsidia, et mechanico-electrica (M&E) limbis ubi moderatio seismica requiritur. Propositum est institui ad normam NFPA 13 et institutiones fabricae, et apta ad incepta quae sequuntur GB 50981 (Codex Seismic Design aedificationis mechanicae et electricae systematis). Available in chalybe carbonii et ferri ductilis QT450, cum electro-galvanizato (zinc-patella) perficiendi ut vexillum et calvanizatum peractum calidum intinge roganti, et suppletur sub UL/Fm indice.
Clavis Commoda
NFPA 13 & GB 50981 Compliant – Designatur ad institutionem per NFPA 13 imperare ue requisita et GB 50981 seismic designa regulas pro systematibus M&E.
UL Optio recensita / FM Approbata - Independenter probata onera ratings pro igne tutelae et limbis mechanicis comprehendendis.
Pipe amplitudo Range - Covers aspersorium fistulae Sch 10/Sch 40, GB/T 3091 et JIS G3454 fistulae ab 1' (25) usque ad 8' (200).
Robustum Load Capacity - UL maximum consilium onerant usque ad 1,370 libras (6.09 kN); FM ad 1,010 pondo (4.49 kN) onus horizontalis aestimat.
Praesidium durabile Corrosio - zinci metam Electro-galvanized ut vexillum; calida-dip galvanized praesto est summus humiditas et sub terra raedam ambitus.
Fast, Instrumentorum simplicium instruitur - Installsway cum Sch 40 1' fistulam stringens, quattuor nuces ad 40-45 N·m contractas ecclesiam perficit, laborem pro redemptoribus minuendo.
UL Maximum Design Load |
|||||
Pipe Size |
|
|
Wt.Each |
||
1'(25mm) Brace Pipe |
|||||
libr. |
kg |
||||
1 |
(25). |
680 |
(3.02) |
0.71 |
(0.35) |
1¼ |
(32). |
680 |
(3.02) |
0.81 |
(0.37) |
1½ |
(40) |
680 |
(3.02) |
0.86 |
(0.39) |
2 |
(50) |
680 |
(3.02) |
0.92 |
(0.42) |
2½ |
(65) |
680 |
(3.02) |
1.01 |
(0.46) |
3 |
(80) |
680 |
(3.02) |
1.08 |
(0.49) |
4 |
(100) |
680 |
(3.02) |
1.21 |
(0.55) |
5 |
(125) |
1090 |
(4.84) |
1.37 |
(0.62) |
6 |
(150) |
1370 |
(6.09) |
1.52 |
(0.69) |
8 |
(219) |
1370 |
(6.09) |
1.81 |
(0.82) |
FM Maximum Design Load |
|||||||
PipeSize |
Horizontalis onus ratings institutionem angulus 30°-44° |
Horizontalis onus ratings institutionem angulus 45°-59° |
Wt.Each |
||||
1''(25mm) Brace Pipe |
|||||||
Ibs. |
kN |
Ibs. |
kN |
libr. |
kg |
||
2 |
(50) |
590 |
(2.62) |
840 |
(3.73) |
0.92 |
(0.42) |
2½ |
(65) |
710 |
(3.15) |
1010 |
(4.49) |
1.01 |
(0.46) |
3 |
(80) |
540 |
(2.40) |
770 |
(3.42) |
1.08 |
(0.49) |
4 |
(100 |
540 |
(2.40) |
770 |
(3.42) |
1.21 |
(0.55) |
6 |
(150 |
270 |
(1.20) |
390 |
(1.73) |
1.52 |
(0.69) |
8 |
(200 |
210 |
(0.93) |
290 |
(1.28) |
1.81 |
(0.82) |
UL Maximum Design Load |
|||||
|
|
|
Wt.Each |
||
1''(25mm) Brace Pipe |
|||||
libr. |
kg |
||||
1¼ |
(40) |
680 |
(3.02) |
1.23 |
(0.56) |
2 |
(50) |
680 |
(3.02) |
1.36 |
(0.62) |
2½ |
(65) |
680 |
(3.02) |
1.45 |
(0.66) |
3 |
(80) |
680 |
(3.02) |
1.54 |
(0.70) |
4 |
(100) |
680 |
(3.02) |
1.76 |
(0.80) |
5 |
(125) |
1090 |
(4.84) |
2.16 |
(0.98) |
6 |
(150) |
1370 |
(6.09) |
2.20 |
(1.00) |
8 |
(200) |
1370 |
(6.09) |
2.79 |
(1.27) |
Magnitudines pro Pipe 1' ad 6' (Top Row Reference):
Positiones (Step 1): Pone corpus U-fulmen seu fibulae circa ignem aspersorium vel fistulam mechanicam ad punctum nodi designatum. Fibulae sedet ut rubor contra tibiae superficiem.
Conventus (Step 2.): virga staminea vel fibulae nexum componentia per designata foramina in fibulae collectae inserta. Obstringere initio manum nucis positio tenere.
Destringens (Step 3.): Torque nuces ad valorem determinatum fabricae clavis torques calibratis utens. Ut virga bractealis recte alignatur cum puncto structurae ancorae ne in fibulationibus flectantur accentus.
For Pipe Size 8' (Bottom Row Reference):
Component Alignment (Step 1): Diametris majoribus (8'), align duplicem fibulae habitationem vel bracket grave circa tibiam. Sera foramina perpendicularis ad fistulam axem perpenduntur.
Impetrandum (Step. 2.): Distrahentes fulmina per fibulae alta Insere flanges. Seras aequabiliter in transverso obstringere, ut pressionis uniformis distributio circa fistulam circumferentiam curet.
Connexio finalis (Step 3): Virgam seismic fibulae affigere ad ocellatum vel bracket in fibulato integrato. Cognoscere nexum esse rigidum et fibulationes circa fistulam non gyrari.
Fibulae tibia cum tibia et aliis nexus accessoriis ut in figura patet; Accessiones UTT18 utuntur fistulae sch40 1-inch;
Nuces constrictae usque ad 40~45N·M semel quattuor nuces installantur, institutio perfecta est.
Interiorem sarcina: Singulae fistulae fibulae in sacculo plastico refertae, deinde in capsula e cistae electronicae exportationis positae sunt.
Exterior sarcina: munitum in thymiamatis plywood, cursares cum nexibus phalangis, ad longum spatium vecturae tutum idoneum.
Shipping Methods: Mare oneraria, oneraria aerea, et expressa internationalia praesto sunt.
Shipping Portus: Qingdao Portus, Shandong, Sinis.
Duc Tempus: 7-15 dies exempla regularis, sub ordine quantitatis.