Function: Designed for multi-pipe systems, enabling rapid pipe fastening to C-channel steel while providing
seismic resistance forthe entire piping network.
Size: 1/2"Thru 8"
Material:Carbon Steel
Finish: Electro-Galvanized, Hot-DipGalvanized
OrderBy: PartNo. and Pipe size
Nominal Pipe Size | D | H | A | B | W | WT. | ||
in | mm | mm | mm | mm | mm | mm | kg | |
UTT82 | 1/2 | DN15 | 23 | 21 | 115 | 75 | 40 | 0.22 |
UTT82 | 3/4 | DN20 | 29 | 26 | 121 | 81 | 40 | 0.24 |
UTT82 | 1 | DN25 | 36 | 33 | 128 | 88 | 40 | 0.27 |
UTT82 | 1-1/4 | DN32 | 45 | 42 | 137 | 97 | 40 | 0.30 |
UTT82 | 1-1/2 | DN40 | 50 | 48 | 142 | 102 | 40 | 0.33 |
UTT82 | 2 | DN50 | 62 | 60 | 154 | 114 | 40 | 0.37 |
UTT82 | 2-1/2 | DN65 | 78 | 76 | 170 | 130 | 40 | 0.43 |
UTT82 | 3 | DN80 | 91 | 89 | 183 | 143 | 40 | 0.49 |
UTT82 | 4 | DN100 | 116 | 114 | 210 | 170 | 40 | 0.71 |
UTT82 | 5 | DN125 | 143 | 141 | 236 | 196 | 40 | 0.83 |
UTT82 | 6 | DN150 | 172 | 168 | 261 | 221 | 40 | 0.95 |
UTT82 | 8 | DN200 | 223 | 219 | 315 | 275 | 40 | 1.21 |
UTT82 standard saddle clamp is a heavy-duty strut channel pipe support fitting engineered for multi-pipe integrated suspension systems. Manufactured from solid carbon steel with two optional anti-corrosion galvanized treatments, this saddle hanger can firmly lock multiple parallel pipelines onto standard C-channel steel while providing overall seismic resistance to the entire piping network.
The complete specification series spans DN15 to DN200, covering all mainstream pipeline sizes for commercial buildings, hospitals, shopping malls, mechanical rooms and industrial workshops. Unified stamping mold ensures consistent dimensional accuracy across all batches, simplifying material preparation and on-site construction matching for contractors. It is widely matched with strut channel, threaded rods, beam clamps and other MEP pipeline accessories to form a full overhead pipe support system.
Single saddle clamp supports clustered parallel pipelines, greatly saving ceiling installation space and cutting construction labor cost;
Pre-punched fixing holes perfectly fit standard slotted C-channel steel, rapid bolt locking without extra adapters;
Electro-galvanized for dry indoor environments; hot-dip galvanized for humid basements, underground parking lots and corrosive industrial workshops;
No weak welding seams, uniform stress distribution, stable load bearing and long-term seismic performance;
Complete dimension table provides accurate D/H/A/B/W and unit weight data for every size, convenient for engineering layout calculation and bid submission.
UTT82 saddle clamp features flat two-side mounting lugs with standard bolt holes. Construction crews only need to align the lugs with the slots on C-channel steel and fasten with standard bolts to finish pipe fixing. Its curved inner arc closely fits the outer diameter of steel pipes without scratching pipeline anti-corrosion coating. Multiple clamps can be arranged in rows on one strut channel to fix multi-layer clustered pipelines neatly and orderly.
Multi-line fire sprinkler overhead support systems;
Commercial building HVAC cold & hot water multi-pipe fixing;
Industrial factory workshop process pipeline clustered suspension;
Hospital, mall and office ceiling integrated MEP piping systems;
Mechanical room bundled galvanized steel pipe seismic restraint.
As a professional manufacturer of seismic resistant pipeline support fittings, we maintain full stock of all UTT82 sizes to support small sample orders and mass bulk production.
We supply complete official technical documents for project bidding, including full dimension datasheets, CAD layout drawings, material test certificates and weight parameter tables. Custom laser LOGO marking and customized galvanized thickness services are available upon client request. Our professional engineering team provides free multi-pipe support layout consultation and on-site installation guidance for construction contractors.
Export Standard Packing: Each piece packed in individual plastic bag, outer export carton; wooden pallet reinforcement available for large bulk orders to prevent transit deformation.
Lead Time: In-stock UTT82 items ship within 3–7 working days; customized orders will confirm production schedule based on order quantity.
Global Logistics Support: We cooperate with professional sea freight, air freight and international express agents to deliver goods worldwide for construction MEP and fire protection projects.