UTT071 & UTT13
UTTERLY TY
| Usage: | |
|---|---|
| Installation Way: | |
| Anti-Rust Grade: | |
| Availability: | |
| Quantity: | |
This complete sway brace assembly consists of UTT071 Structural Attachment and UTT13 "Fast Clamp" Sway Bracing Attachment. Designed for fire sprinkler piping system to resist sway and seismic disturbance. Matched with bracing pipe element and UTT structural fittings to form full seismic bracing solution. Installation shall follow NFPA 13 standard and manufacturer official instructions. Widely used for sprinkler pipes complying with Sch10, Sch40, GB/T 3091, JIS G3454.
Combined kit: UTT071 ductile iron structural fitting + UTT13 carbon steel fast clamp pipe attachment, complete sway brace set.
Electro galvanized finish, excellent corrosion resistance for indoor fire protection projects.
UL, CE, FM approved, performance complies with NFPA 13 seismic bracing requirements.
UTT071 one size fits up to 8 inch pipe; UTT13 covers pipe size from 1"~8"(25~200mm), wide pipe range coverage.
Quick installation with shear bolt for UTT071; UTT13 fast clamp design saves site assembly time.
Clear load rating data for engineering selection, reliable seismic performance.
Function: Designed for bracing pipe against sway and seismic disturbance.The pipe attachment component of a sway brace system used in conjunction with a UTT Manufacturing structural attachment fitting and joined together with a bracing pipe element forms a complete sway brace assembly.Sway brace assemblies are intended to be installed in accordance with NFPA13 and the manufacturer's installation instructions..
Type: Sprinkler Pipe Sch 10,Sch 40,GB/T 3091,JIS G3454
Size: One size fits braced pipe up to 8", with 1/2" bolt hole for structure.
Material: Ductile iron QT450
Finish: Electro - galvanized
UL Maximum Design Load | ||||
Brace Member | lbs. | KN | Wt.Each | |
lb. | kg | |||
1"SCH40pipe | 1885 | (8.38) | 2.22 | (1.01) |
Function: Designed for bracing pipe against sway and seismic disturbance. The pipe attachment component of a sway brace system used in conjunction with a UTT Manufacturing structural attachment fitting, and joined together with a bracing pipe element forms a complete sway brace assembly. Sway brace assemblies are intended to be installed in accordance with NFPA 13 and the manufacturer's installation instructions.
Type:Sprinkler Pipe Sch 10,Sch 40,GB/T 3091,JIS G3454
Material: Carbon steel
Finish: Electro-galvanized
Approvals: UL:pipe size 1''(25)thru 8''(200);
FM:pipe size 2''(50)thru 8''(200)
It can be used for the connection of single-tube small-space lateral or longitudinal supports
It is applicable to the connection of all kinds of pipes with a diameter of DN200 and below
Surface treatment: electro-galvanizing, hot-dip galvanizing, Dacromet, epoxy spraying
Design: Meets the requirements of GB50981D
Installation: Insert the DN25 welded pipe into the middle of the double U-shaped clamp, fix it at the position that requires seismic connection, evenly lock the nuts at both ends, and fix the other end of the steel pipe to the seismic connection seat
UL Maximum Design Load | |||||
Pipe Size | lbs. | kN | Wt. Each | ||
1"(25mm) Brace Pipe | |||||
lb. | kg | ||||
1 | (25) | 680 | (3.02) | 0.71 | (0.35) |
1¼ | (32) | 680 | (3.02) | 0.81 | (0.37) |
1½ | (40) | 680 | (3.02) | 0.86 | (0.39) |
2 | (50) | 680 | (3.02) | 0.92 | (0.42) |
2½ | (65) | 680 | (3.02) | 1.01 | (0.46) |
3 | (80) | 680 | (3.02) | 1.08 | (0.49) |
4 | (100) | 680 | (3.02) | 1.21 | (0.55) |
5 | (125) | 1090 | (4.84) | 1.37 | (0.62) |
6 | (150) | 1370 | (6.09) | 1.52 | (0.69) |
8 | (219) | 1370 | (6.09) | 1.81 | (0.82) |
FM Maximum Design Load | |||||||
Pipe Size | Horizontal load ratings installation angle 30°-44° | Horizontal load ratings installation angle 45°-59° | Wt. Each | ||||
1"(25mm) Brace Pipe | |||||||
Ibs. | kN | Ibs. | kN | lb. | kg | ||
2 | (50) | 590 | (2.62) | 840 | (3.73) | 0.92 | (0.42) |
2½ | (65) | 710 | (3.15) | 1010 | (4.49) | 1.01 | (0.46) |
3 | (80) | 540 | (2.40) | 770 | (3.42) | 1.08 | (0.49) |
4 | (100) | 540 | (2.40) | 770 | (3.42) | 1.21 | (0.55) |
6 | (150) | 270 | (1.20) | 390 | (1.73) | 1.52 | (0.69) |
8 | (200) | 210 | (0.93) | 290 | (1.28) | 1.81 | (0.82) |
Install:
Install:The installation mode of TY071's base part confined with the building ,the installation torque of bolt M12 is 50~65N · M.The accessories of TY071 base part use the sch40 1-inch pipe .The connecting pipe should be inserted into the bottom according to the direction shown in the figure, and tighten with shear bolt.Tighten the shear bolt until heads break off, the installation is complete.
Installation:
Place over the pipe to be braced,adjust brace angle,and insert bracing pipe through opening leaving a minimum of 1"(25.4)extending from attachment.Brace pipe can be installed on top or bottom of pipe to be braced but must be a minimum of 6"(152.4)away from a pipe joint.Tighten nuts down evenly until 30~35NM to make all green making lines visible.